• Centrifuge PAU – 75 ,5T L=11.0m W=7.00m H=12.0m |
Project : |
MEG Regeneration Plant KG D6 |
|
![]() |
• Vacuum PAU – 62,5 T L=15.5m W=7.00m H=5.2m |
OME contributed with the Area Engineering Lead position, package engineering, and review and check of
ISOmetric drawings for the Vacuum and Centrifuge PAU’s (Pre-Assembled Units) at AkerKværner Process systems AS for the MEG Recalmation Plant in Kakinada, India. |
||
![]() |
Project : |
NEXUS FPSO I |
||
OME contributed with HV cable tray and HV cable routing on production deck, generation and updating of misc. electro design drawings, and wiring diagrams. Drawings generated in Microstation 3D and PDMS. |
||||
![]() |
![]() |
Project : |
DP High Load |
|