Centrifuge PAU – 75 ,5T

L=11.0m W=7.00m H=12.0m

Project :
Customer :
Duration :

MEG Regeneration Plant KG D6
AkerKværner Process Systems AS, Fornebu, Norway
2007 - 2008

 Vacuum PAU – 62,5 T

L=15.5m W=7.00m H=5.2m

OME contributed with the Area Engineering Lead position, package engineering, and review and check of ISOmetric drawings for the Vacuum and Centrifuge PAU’s (Pre-Assembled Units) at AkerKværner Process systems AS for the MEG Recalmation Plant in Kakinada, India.

Pictures showing Load Out of the PAU’s at Bladt Industries AS, Aalborg Denmark in January 2008.

Project :
Customer :
Duration :

NEXUS FPSO I
Rambøll Oil & Gas, Sandefjord, Norway
2007 - 2008

OME contributed with HV cable tray and HV cable routing on production deck, generation and updating of misc. electro design drawings, and wiring diagrams. Drawings generated in Microstation 3D and PDMS.

Project :
Customer :
Duration :

DP High Load
Grenland Group Technology, Sandefjord, Norway
2007